Construction of Expansion of the Tbilisi Metro Line 2 & the new University Station
Employer: Georgian Municipal Development Fund, Tbilisi Transport Company
Funded by: Asian Development Bank
Design Engineer: Euro Studios
Lead Contractor: Cobra – Assignia
Contractor: Prime Concrete
Value: 2.2 million EURO
Scope of works:
• Demolition of existing underground r/c structures and cleaning of the tunnels
• Construction of underground platform, upper station, el. substation, pedestrian passages, shaft for escalators
• Rehabilitation of concrete lining of the tunnel (demolition, repair of reinforcement, plastering, shotcreting)
• Rehabilitation of steel lining (high pressure water jet cleaning)
• Cement mortar and grout injection