ureki wastewater treatment plant

UREKI WWTP

by Giorgi Maruashvili
Rate this post

WATER INFRASTRUCTURE PROJECT IN KUTAISI, POTI & ANAKLIA – UREKI SECTION

Employer: United Water Supply Company of Georgia
Funded by: Asian Development Bank
Contractor: Ludwig Pfeiffer Hoch- und Tiefbau GmbH & co.KG (Germany)
Supervisor Engineer: Eptisa (Spain)
Prime Concrete: Sub Contractor for earthwork, foundation, reinforced concrete structures, turn-key operation and administration buildings
Value: 1.720 million EUR

Prime Concrete, in the framework of large scale tourism infrastructure projects in Georgia, has finished construction of biological treatment facilities in Anaklia. In the scope of this project, we have completed up to 10 reservoirs of different types and volume, buildings for administrative and technological purposes, internal road infrastructure, etc. Total volume of our construction works exceed 5500 m3 concrete.

In the administrative and technological buildings, we have completed both the internal and external construction. At the same time, we have fully completed the electrical systems and the biological treatment facilities. All the construction and installation works have been built in accordance with local and international standards, including construction safety standards and environmental protection.

Scope of works:
• Ground preparation and soil stabilization
• Construction (in-situ) of waste water treatment reservoir (4 000 m3)
• Construction of chlorination chamber
• Construction of operation and administration buildings
• Construction of internal roads, fence and gate